Browse by Tags

All Tags » K2 blackpearl » K2 for Visual Studio   (RSS)
  • Adding IPC Event to a process from a different Solution file

    Simple question - can it be done? Scenario: I have a process managing Sales Contract processing. At a stage in the process, I need to kick off some offline billings processes (bill, credit, cancellation) based on values captured in a form and stored in SmartObjects. These Billings processes can also be started manually, and so they have been ...
    Posted to General (Forum) by PaulShrimpton on July 17, 2008
  • K2 Workflow instance for multiple documents in sharepoint is this possible?

    Hi all,  we have a business entity (piece of information) that consists of multiple documents. we want to create an approval workflow for this type of information without approving each document separately. it is like having “attachment” workflows. where multiple documents are attached to the workflow instance. is this possible ...
    Posted to General (Forum) by aabukar on May 15, 2008
  • Web Service could not be resolved

    All- I have a workflow process that I have added two web services to using the project references interface. They deployed and worked perfectly until I closed the K2 Designer and opened the project again. How it is as if the web service references are not there. I get the following error when I build the project.  ''Assembly Reference ...
    Posted to General (Forum) by miketrouard on May 6, 2008
  • Upload documents from file system to Sharepoint Document Library query

    Hi guys I need a little guidence with a process I am developing.  The process involves uploading documents from a file system to a Sharepoint document library. The Documents are saved into to the file system folder automatically and these are then to be uploaded to a sharepoint library - this bit is straight forward. However a couple of ...
    Posted to General (Forum) by DavidOndeo on March 25, 2008